County, city road crews prepare for winter

No measureable snow has fallen yet, but city and county crews are ready once the snow starts piling up.

Jay Waddingham, Franklin County Engineer, said winter preparations typically begin in the summer, when salt is pur-chased through the Iowa DOT. Doug Tarr, Hampton Public Works Director, also said the city begins purchas-ing and stocking up salt and sand far before snow is a threat.

Preparation efforts ramp up as fall arrives and the air cools. Waddingham said plows and sanders are equipped in mid-October and wings are put on trucks the first of November. Wad-dingham said preparation is vital when addressing winter weather, as storms can hit with little notice.

“You never know when there’s going to be an ice storm or an early snow event,” he said. “Especially for ambulance and fire crews, if they have to go somewhere, we have to move the way for them.”

Read the full story in the December 14 edition.

Sheffield Press & Pioneer Enterprise

The Sheffield Press
305 Gilman Street
PO Box 36
Sheffield, IA 50475
Phone:  641-456-2585

The Pioneer Enterprise
PO Box 302
Rockwell, IA 50469
Phone:  641.456.2585

Mid-America Publishing

This newspaper is part of the Mid-America Publishing Family. Please visit www.midampublishing.com for more information.