Rockwell Aquatic Center Improvements Completed

A round of renovations to improve the quality of the Rockwell Aquatic Center wrapped up at the beginning of May.

The nearly $28,000 project, funded through the Local Option Sales Tax (LOST), included having the pool professionally painted and the slides resurfaced.

This was the first time the pool has been professionally painted. In the past, members of the staff did it. This time around, ACCO Unlimited Corporation, of Johnston, repainted the pool white, and repainted black racing stripes and depth-change markers. The company also power washed the pool, patched cracks, tightened the ladders and completed other maintenance projects.

Read the full article in the May 25 edition of the papers.

Sheffield Press & Pioneer Enterprise

The Sheffield Press
305 Gilman Street
PO Box 36
Sheffield, IA 50475
Phone:  641-456-2585

The Pioneer Enterprise
PO Box 302
Rockwell, IA 50469
Phone:  641.456.2585

Mid-America Publishing

This newspaper is part of the Mid-America Publishing Family. Please visit www.midampublishing.com for more information.